sign in

MaSS - Chelmsford PV

Chelmsford Crooked Spring Water Treatment Facility
Chelmsford, MA 01863
Since monitoring began 10/27/2010, this system has generated 585061 kilowatt hours of clean energy.
Enough to offset...
lbs. of CO2 emissions, the main cause of global warming.
miles worth of CO2 emissions from the average American car.
Enough power for...
days of electricity usage in an average American house.
hours using a 13-watt energy-efficient CFL light bulb.

Installation Profile

Array Azimuth Array Tilt Capacity Commissioned
485.0 OCT 27
2010
180° 20° Kilowatts (DC) Oct 27, 2010

Hardware Components

Module Type Module Wdc Quantity Total Capacity (KWdc)
Kyocera Solar KD210GX 210 2310 485.100
Inverter Type Inverter Wac Quantity Total Capacity (KWac)
Solectria SGI 500 500000 1 500.000
Meter/Datalogger Type System Channel
Elster A3 ALPHA Energy production (meter interface)